Council — Prepare Survey Files
Describe the application, material route, growing or working area and proposed rental period. A listed scenario is not a claim that a Dugong rental unit or local service is available.
This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.
Survey Existing Ground
Surveying existing ground is the first project-stage record of the surface to be changed. Agree the coverage before the survey so critical features are not omitted.
Before moving material
Define boundaries of work, reference control and required detail.
Receiving operation and checks
Issue the survey with datum, units and limitations stated. Check control-point agreement and representation of abrupt terrain changes.
A survey deliverable should not be confused with a legal boundary determination.
Read the complete Survey Existing Ground guidePrepare for Compaction
Preparation for compaction ensures that the compactor receives suitable material in the intended layer arrangement. Grading and moisture conditioning must fit the project requirements.
Before moving material
Confirm material, layer depth and compaction method.
Receiving operation and checks
Compact and test according to the brief. Inspect edges and areas inaccessible to the main compaction plant.
There is no single pass count or moisture target suitable for all materials.
Read the complete Prepare for Compaction guideSurvey & Verify
Survey and verification compares the delivered surface with the brief before it is covered by the next layer. It should establish both compliant areas and defects.
Before moving material
Agree the acceptance method and reference.
Receiving operation and checks
Record accepted work and required corrections. Check the issued design revision and datum used for comparison.
A level survey cannot prove compaction, and a density test cannot prove grade.
Read the complete Survey & Verify guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group