Prepare for Compaction

Preparation for compaction ensures that the compactor receives suitable material in the intended layer arrangement. Grading and moisture conditioning must fit the project requirements.

Before moving material

Confirm material, layer depth and compaction method.

Receiving operation and checks

Compact and test according to the brief. Inspect edges and areas inaccessible to the main compaction plant.

There is no single pass count or moisture target suitable for all materials.

Read the complete Prepare for Compaction guide

Prepare for the Next Operation

Preparing for the next operation means identifying what the receiving team needs to start without rework. The handover may need access, layer condition, levels and records.

Before moving material

Ask the next operator or contractor for the required surface condition.

Receiving operation and checks

Hand over the checked area with outstanding items stated. Verify the agreed interface rather than only the grading team's own completion point.

Do not transfer unresolved defects silently to the next trade.

Read the complete Prepare for the Next Operation guide

Council and Government Project Briefs

A government or council project brief should separate asset requirements from the choice of grading plant. Specify the surface outcome and acceptance evidence before inviting machinery-based solutions.

Before moving material

Identify the asset, stakeholders and required design inputs.

Receiving operation and checks

Review the proposed method against the brief and retain acceptance records. Check that design, grading, testing and handover responsibilities are assigned.

No government endorsement or supplier-panel membership is implied.

Read the complete Council and Government Project Briefs guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group