Controlled Soil Movement

Controlled soil movement is deliberate placement of suitable material from a defined source to a defined receiving area. The route and load should support that plan.

Before moving material

Identify usable source material and destination levels.

Receiving operation and checks

Grade and prepare the receiving layer. Check the destination and quantity as well as the cut location.

An implement cannot make unsuitable material suitable merely by transporting it.

Read the complete Controlled Soil Movement guide

Soil Redistribution

Soil redistribution moves existing material within an area rather than importing a complete new layer. It works best when the source material suits the receiving use and its movement does not damage the productive layer.

Before moving material

Inspect soil layers and mark areas to remain undisturbed.

Receiving operation and checks

Blend the corrected area and restore the required soil preparation. Check both the cut depth and the final receiving level.

Unsuitable or contaminated material should not be spread simply to achieve a visual finish.

Read the complete Soil Redistribution guide

Irrigation Landforming

Irrigation landforming connects the field surface to the method of applying water. The appropriate design depends on the supply, soil and planned operating sequence.

Before moving material

Survey field levels together with water-supply and drainage structures.

Receiving operation and checks

Check the formed field before the next cultivation or irrigation operation. Observe advance and recession of water where practical rather than relying only on a dry appearance.

Landforming is one part of irrigation performance, not a guaranteed efficiency percentage.

Read the complete Irrigation Landforming guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group