Survey Existing Ground

Surveying existing ground is the first project-stage record of the surface to be changed. Agree the coverage before the survey so critical features are not omitted.

Before moving material

Define boundaries of work, reference control and required detail.

Receiving operation and checks

Issue the survey with datum, units and limitations stated. Check control-point agreement and representation of abrupt terrain changes.

A survey deliverable should not be confused with a legal boundary determination.

Read the complete Survey Existing Ground guide

Earthworks Design

Earthworks design compares existing terrain with the intended surface and accounts for material movement. It must also consider where the resulting water and traffic will go.

Before moving material

Obtain a suitable survey and identify constraints.

Receiving operation and checks

Issue the approved revision and construction checks. Review critical connections and quantity assumptions.

Geometric balance does not establish usable material balance or structural design.

Read the complete Earthworks Design guide

Prepare for Compaction

Preparation for compaction ensures that the compactor receives suitable material in the intended layer arrangement. Grading and moisture conditioning must fit the project requirements.

Before moving material

Confirm material, layer depth and compaction method.

Receiving operation and checks

Compact and test according to the brief. Inspect edges and areas inaccessible to the main compaction plant.

There is no single pass count or moisture target suitable for all materials.

Read the complete Prepare for Compaction guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group