Shed Pad Preparation

A shed pad must support its intended use and remain connected to access and drainage. Light storage, vehicle use and other activities can require different formation and material decisions.

Before moving material

Confirm shed layout, floor level, access loads and services.

Receiving operation and checks

Complete compaction and the shed builder's required checks. Inspect transitions at doorways and runoff routes beside the pad.

The machine selection does not establish structural suitability.

Read the complete Shed Pad Preparation guide

GNSS Machine Control

GNSS machine control combines positioning, machine geometry and design information. An accurate receiver position is not automatically an accurate cutting-edge position.

Before moving material

Confirm corrections, sensor arrangement and the coordinate reference.

Receiving operation and checks

Check the completed surface with an independent method. Inspect offsets, design revision and correction status when results disagree.

Compatibility must be confirmed for the actual machine and control installation.

Read the complete GNSS Machine Control guide

Precision Grade Control

Precision grade control is the stage where a reference system is commissioned for the intended surface. It needs design transfer and equipment checks before productive grading.

Before moving material

Confirm design revision, datum and the working-edge reference.

Receiving operation and checks

Verify surface results independently during and after the work. Record calibration and any reference interruptions.

Machine guidance is not acceptance certification.

Read the complete Precision Grade Control guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group