Transport And Loading — Process Sequence

Describe the application, material route, growing or working area and proposed rental period. A listed scenario is not a claim that a Dugong rental unit or local service is available.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Transport Lockouts and Machine State

Transport lockouts and parked-machine arrangements should follow the supplied machine instructions. A hydraulic control position should not be treated as an unspecified mechanical transport restraint.

Before moving material

Identify the actual locking and isolation arrangements.

Receiving operation and checks

Use the transport company's agreed loading and restraint process. Check that the machine is in its specified transport state.

This guide does not design a restraint system or replace the machine manual.

Read the complete Transport Lockouts and Machine State guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry