Rental Return Planning

Rental return planning should protect the machine, transport personnel and the next job. Agree cleaning, attachments, inspection and return freight before dispatch.

Before moving material

Confirm the rental agreement and the site's material and biosecurity conditions.

Receiving operation and checks

Complete the agreed inspection and handover. Check supplied attachments and the machine's required transport configuration.

Return conditions and charges belong to the actual rental agreement.

Read the complete Rental Return Planning guide

Irrigation Landforming

Irrigation landforming connects the field surface to the method of applying water. The appropriate design depends on the supply, soil and planned operating sequence.

Before moving material

Survey field levels together with water-supply and drainage structures.

Receiving operation and checks

Check the formed field before the next cultivation or irrigation operation. Observe advance and recession of water where practical rather than relying only on a dry appearance.

Landforming is one part of irrigation performance, not a guaranteed efficiency percentage.

Read the complete Irrigation Landforming guide

Irrigation Bay Levelling

An irrigation bay needs a planned relationship between inlet, surface, banks and outlet. Local low areas can retain water while high areas delay its movement.

Before moving material

Record bay dimensions, boundary levels and existing supply/outlet details.

Receiving operation and checks

Recheck levels and observe an irrigation event before declaring the bay complete. Inspect the far end and corners for residual depressions.

No single bay slope or inlet setting suits every soil and water supply.

Read the complete Irrigation Bay Levelling guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group