Landscape Contractor — Method Statement Planning
Describe the application, material route, growing or working area and proposed rental period. A listed scenario is not a claim that a Dugong rental unit or local service is available.
This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.
Landscape Contouring
Landscape contouring deliberately shapes the land for function and appearance. The profile still needs to connect to drains, access and retained structures.
Before moving material
Identify design contours, finished levels and protected trees or services.
Receiving operation and checks
Place the growing layer and complete planting or hardscape work. Inspect drainage and transitions around the finished contours.
Do not interpret a visual concept as a construction survey.
Read the complete Landscape Contouring guideLandscape Rakes
A landscape rake separates or moves surface debris and can assist preparation of a growing surface. It does not provide the same excavation and carrying function as a scraper.
Before moving material
Identify debris type and the layer being prepared.
Receiving operation and checks
Complete growing-medium preparation or planting. Check for remaining debris and unwanted disturbance of the underlying layer.
Do not confuse a clean appearance with a verified grade or soil specification.
Read the complete Landscape Rakes guideSurvey Existing Ground
Surveying existing ground is the first project-stage record of the surface to be changed. Agree the coverage before the survey so critical features are not omitted.
Before moving material
Define boundaries of work, reference control and required detail.
Receiving operation and checks
Issue the survey with datum, units and limitations stated. Check control-point agreement and representation of abrupt terrain changes.
A survey deliverable should not be confused with a legal boundary determination.
Read the complete Survey Existing Ground guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.