Road-Base Preparation
Road-base preparation controls a specified aggregate layer, not ordinary topsoil. Even distribution and the right shape help the compaction and surfacing operations that follow.
Before moving material
Confirm aggregate type, accepted subgrade and planned layer thickness.
Receiving operation and checks
Compact and complete the project's layer-acceptance checks. Measure levels and thickness at representative locations and transitions.
Do not use a nominal scraper load count as evidence of compacted layer depth.
Read the complete Road-Base Preparation guideFinished Surface Handover
A finished-surface handover records the surface that has been delivered and the evidence supporting it. It should identify what was checked and what lies outside the grading scope.
Before moving material
Agree the finished purpose and acceptance responsibilities.
Receiving operation and checks
Release the area to use or the next construction stage when accepted. Retain unresolved items and limits alongside the acceptance record.
The term finished should not imply certification beyond the checks actually performed.
Read the complete Finished Surface Handover guideHow to Prepare Subgrade for Road Base
Before road base is placed, the subgrade should be accepted for both level and condition. An uneven or weak supporting surface can lead to thickness variation and premature failure above it.
Before moving material
Confirm formation level and identify unaccepted areas.
Receiving operation and checks
Inspect and accept before spreading base aggregate. Record level and material checks for the same work area.
Adding more base material is not automatically a remedy for weak subgrade.
Read the complete How to Prepare Subgrade for Road Base guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group