Earthworks Design
Earthworks design compares existing terrain with the intended surface and accounts for material movement. It must also consider where the resulting water and traffic will go.
Before moving material
Obtain a suitable survey and identify constraints.
Receiving operation and checks
Issue the approved revision and construction checks. Review critical connections and quantity assumptions.
Geometric balance does not establish usable material balance or structural design.
Read the complete Earthworks Design guideHow to Calculate Soil Haul Distance
Calculate soil haul distance along the usable travel route, not just between two map points. Loaded and empty travel can follow different paths.
Before moving material
Locate material source, receiving area and turning spaces.
Receiving operation and checks
Compare the estimate with a timed realistic trial. Record distance, speed assumptions and interruptions separately.
The result is a planning estimate, not a guaranteed machine output.
Read the complete How to Calculate Soil Haul Distance guideGolf Course Earthworks
Golf-course earthworks form designed contours and feature-specific surfaces. Smoothing away a deliberate mound or swale can defeat the course design.
Before moving material
Set out the intended feature and identify rootzone and drainage layers.
Receiving operation and checks
Complete the relevant drainage and turf preparation operations. Compare the finished shape with the feature design rather than a generic plane.
Greens, tees, fairways and paths need different acceptance criteria.
Read the complete Golf Course Earthworks guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group