The Surface Is the Handover

The surface is the handover between operations. An excavator may finish its excavation, but the roller still needs suitable material, lift thickness and moisture. A scraper may finish shaping, but the irrigation operator still needs a connected fall to a usable outlet. Define acceptance at each transition instead of allowing the next machine to inherit an unresolved problem.

Before moving material

Name the operation that receives the surface and agree its requirements.

Receiving operation and checks

Release the area to the next operation only after outstanding defects are identified. Use independent level checks and project-specific material tests where required.

Visual smoothness alone does not prove compaction, bearing capacity or hydraulic performance.

Read the complete The Surface Is the Handover guide

Machine Before - Dugong - Machine After

The machine before Dugong determines what material arrives; the machine after Dugong determines what surface must leave. An excavator can expose formation, a loader can deliver a stockpile, and a roller can compact the placed layer. The scraper's role is bounded by those interfaces.

Before moving material

Identify the upstream operation and its remaining defects.

Receiving operation and checks

Hand over the measured surface to compaction, cultivation, paving or turf preparation. Record which operation owns levels, materials and final acceptance.

The workflow can include Dugong where suitable; it does not assume Dugong replaces adjacent equipment.

Read the complete Machine Before - Dugong - Machine After guide

GNSS Machine Control

GNSS machine control combines positioning, machine geometry and design information. An accurate receiver position is not automatically an accurate cutting-edge position.

Before moving material

Confirm corrections, sensor arrangement and the coordinate reference.

Receiving operation and checks

Check the completed surface with an independent method. Inspect offsets, design revision and correction status when results disagree.

Compatibility must be confirmed for the actual machine and control installation.

Read the complete GNSS Machine Control guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.