Project reference 11730

San Joaquin Valley — Renewable Energy Sites

Describe the application, material route, growing or working area and proposed rental period. A listed scenario is not a claim that a Dugong rental unit or local service is available.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Bank, Loose and Compacted Volumes

Bank, loose and compacted volumes describe material in different states. A surveyed excavation volume, a carried scraper load and an accepted fill volume should not be compared as if they were identical.

Before moving material

Choose the volume basis for quantities and production estimates.

Receiving operation and checks

Reconcile placed quantities with survey and material records. Keep nominal capacity, load factor and compacted quantity separate.

No universal soil bulking or shrinkage factor is assumed.

Read the complete Bank, Loose and Compacted Volumes guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group