Driveway Grading
Driveway grading must tie vehicle access to existing thresholds and drainage. A change at the entrance can move water towards a building or create an abrupt vehicle transition.
Before moving material
Survey thresholds, boundaries, drains and buried services.
Receiving operation and checks
Compact or prepare for the selected final surfacing. Check vehicle transitions and the route taken by runoff.
Do not determine driveway drainage from appearance alone.
Read the complete Driveway Grading guideLand Levelling
Land levelling changes the relationship between high and low areas. It need not mean a horizontal surface: many uses require a deliberate fall. Define that finished relationship before deciding where soil should move.
Before moving material
Survey the site and protect a usable elevation reference.
Receiving operation and checks
Make controlled finishing passes and remeasure before the next operation. Check the designed fall as well as local smoothness.
Removing every visible high spot without a plan can create a new drainage problem.
Read the complete Land Levelling guidePrecision Landforming
Precision landforming follows a designed surface rather than repeatedly smoothing whatever the operator sees. Its value lies in controlling where material is removed and placed relative to that surface.
Before moving material
Establish reliable survey control and a suitable design model.
Receiving operation and checks
Record the achieved surface before cultivation, compaction or construction. Check joins and breaklines where changes in slope are intentional.
Guidance accuracy alone does not prove the material or finished surface is suitable.
Read the complete Precision Landforming guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group